Murum Dam
The Murum Dam is a gravity dam on the Murum River in the province of Sarawak on the Malaysian island of Borneo. Construction began in 2008. The dam's reservoir began to fill in July 2013 and the first generator was commissioned in December 2014. The fourth and final turbine began operations on 8 June 2015. Concerns have been raised about the displacement of the Dayak people and the removal of rainforest due to the construction of the dam. The dam site is located on the Murum River, which is in the uppermost part of the Rajang River basin, from Bintulu. The upstream of Rajang river includes four steps, which are Pelagus, Bakun, Murum, and Belaga. The Murum Hydroelectric Project is the second Step-Hydroelectric Project of the four steps, and is from the constructing Bakun Hydroelectric Project downstream. ==See also==
*Sarawak Corridor of Renewable Energy *Environmental concerns with electricity generation
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Murum Dam」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|